Kings School Remuera, Rugby Field

Work Performed 

The project was a full design-and-build construction.

Work Involved

  • Design of finished playing levels and drainage requirements
  • Earthworks, drainage, fencing, footpaths, permeable and sub base construction 
  • Placement of artificial turf 
KingsSchool-01
KingsSchool-02
KingsSchool-04
KingsSchool-05
KingsSchool-06
KingsSchool-07
1/6 
start stop bwd fwd
KingsSchool-12
KingsSchool-13
KingsSchool-14
KingsSchool-15
KingsSchool-16
KingsSchool-17
1/6 
start stop bwd fwd

 

 

 

 

 

 

 

 

 

 

 

Designed to FIFA/IRB

Same construction design as per FIFA

Turfe Used

Elite 55 rubber-filled playing surface (FIFA/Star)

Ancillary Works

Placement by Auckland Civil of large scale fencing requirements, footpaths and retaining walls

Subcontractors involved

  • An Auckland Civil/TEAM Sports Surfaces project with no subcontractors

Reference