Bucklands Beach Intermediate

Work Performed 

This was an Auckland Civil/TEAM Sports joint project and again our ‘one stop shop’ paid dividends for the client. A great working relationship formed between ourselves, OCTA and Finsports with drainage retention and subgrade issues resolved in a timely and efficient manner. The School and local community are very happy with this all-weather surface.

Work Involved

  • Extensive earthworks, including cut to fill to form subgrade heights
  • Subsoil drainage network plus storm water retention and connection works.
  • Permeable base course design and laser finished top layer to Auckland Civil/TEAM Sports exacting standards
  • Permeable OGPA hotmix
  • Multiuse turf 3000m2
BucklandsInterm-ls01
BucklandsInterm-ls02
BucklandsInterm-ls03
BucklandsInterm-ls04
BucklandsInterm-ls05
BucklandsInterm-ls06
BucklandsInterm-ls07
BucklandsInterm-ls08
BucklandsInterm-ls09
BucklandsInterm-ls10
BucklandsInterm-ls11
BucklandsInterm-ls12
BucklandsInterm-ls13
01/13 
start stop bwd fwd
BucklandsInterm-pt01
BucklandsInterm-pt02
BucklandsInterm-pt03
BucklandsInterm-pt04
BucklandsInterm-pt05
1/5 
start stop bwd fwd

 

 

 

 

 

 

 

 

 

 

Standards met

Built to exacting horizontal tolerances for base course, hotmix and subsoil drainage design – permeable vertically draining base

Turfe Used

Multi-use Satellite

Ancillary Works

Perimeter footpaths, fencing and public drainage.

Subcontractors involved

  • Fencerite – fencing 
  • An Auckland Civil/TEAM Sports Surfaces project