Papatoetoe North Primary
Work Performed
- Extensive earthworks, including cut to fill to form subgrade heights
- Subsoil drainage network plus storm water retention and connection works.
- Permeable base course design and laser finished top layer to Auckland Civil/TEAM Sports exacting standards
- Permeable OGPA hotmix
- Multiuse turf 3000m2
Standards met
Built to exacting horizontal tolerances for base course, hotmix and subsoil drainage design – permeable vertically draining base
Turf Used
Multi-use Satellite
Ancillary Works
Perimeter footpaths, fencing and public drainage.