Bucklands Beach Intermediate

Work Performed
This was an Auckland Civil/TEAM Sports joint project and again our ‘one stop shop’ paid dividends for the client. A great working relationship formed between ourselves, OCTA and Finsports with drainage retention and subgrade issues resolved in a timely and efficient manner. The School and local community are very happy with this all-weather surface.

Work Involved

  • Extensive earthworks, including cut to fill to form subgrade heights
  • Subsoil drainage network plus storm water retention and connection works.
  • Permeable base course design and laser finished top layer to Auckland Civil/TEAM Sports exacting standards
  • Permeable OGPA hotmix
  • Multiuse turf 3000m2

Standards met
Built to exacting horizontal tolerances for base course, hotmix and subsoil drainage design – permeable vertically draining base

Turf Used
Multi-use Satellite

Ancillary Works
Perimeter footpaths, fencing and public drainage.

Subcontractors involved

  • Fencerite – fencing
  • An Auckland Civil/TEAM Sports Surfaces project

References